INSURANCE / HAIL DAMAGE

In progress

Holland Park West Townhouse Re-Roof

Insurance roof replacement across a 22-townhouse complex in Holland Park West.

Stage 1 completed

THE PROJECT

Staged Roof Replacement Across An Occupied Townhouse Complex.

Scope

IRE Roofing is replacing hail-damaged roofs at a 22-townhouse complex in Holland Park West for an insurance repair builder. The works are being delivered in stages while residents remain on site. IRE is coordinating crane lifts and edge protection with the builder’s programme.

Staging Work Around Residents And Site Access

The crew completes one group of townhouses before moving to the next. That means sequencing deliveries, lifts and roofing works around resident access and other trades, with materials positioned for each stage.

With crane access through the adjoining park ruled out, IRE planned separate crane visits for staged material lifts. The aim was to limit how much material needed to be stored at any one time and reduce manual handling between work areas.

Outcome To Date

Stage 1 finished on 6 November 2026 and covered six townhouses. IRE sent progress and completion photos and supporting documentation to the builder. The remaining roof replacements are in progress.

Project Timeline

  1. Stage 1 complete

    Roof replacement completed for six of the 22 townhouses.

  2. Crane lifts for material staging

    Crane lifts helped position roofing materials for the next works.

  3. Ongoing
    Remaining roof replacements

    Works continue in stages, with crane access, edge protection and deliveries planned around residents and other trades.

Reference available on request.